Duration: 10 Weeks Description:

The £1.45bn complex which houses more than 300 shops, 70 restaurants, a 14-screen cinema, three hotels, a bowling alley and the UK’s largest casino opened in September 2011 in time for the 2012 Olympics.

We have carried out a variety of installations on behalf of our clients that include the following:

ADIDAS – The installation of 600×600 porcelain tiles throughout the sales area with vinyl tiles to back of house. Incorporating the build-up of the subfloor using 20mm Backer Board.

FOOTLOCKER – The installation of 600×600 porcelain tiles throughout the sales area with vinyl tiles to back of house. Incorporating the build-up of the subfloor using 20mm Backer Board.

STRADA – The installation of European Oak wood flooring throughout the restaurant area on a subfloor build-up of 25mm plywood. The restrooms were fitted out with 1200×600 porcelain floor tiles and 600×600 porcelain wall tiles.

ALDOs – The installation of 600×600 porcelain tiles throughout the sales area with vinyl tiles to back of house. Incorporating the build-up of the subfloor using 20mm Backer Board.

THOMAS SABO – The installation of Wenge Timber wood flooring throughout the sales area with sheet vinyl to the back of house.

SKAGEN – The installation of Engineered Timber flooring throughout the sales area with sheet vinyl to the back of house areas on a subfloor build-up of 25mm plywood

GIRAFFE – The installation of Engineered Timber flooring throughout the restaurant area with ceramic tiling to the bar area and feature walls.

H SAMUELS – The installation of 160m² 795mm x 795mm ceramic tiles to the sales area with Vinyl tiles to the back of house area.

ERNEST JONES – The installation of 120m² Axminister carpet on a Durafit System along with 25m² of Timber Planking and 40m² of Vinyl tiles to the back of house area.

VUE CINEMA – The installation of 260m² of 20mm Lime Stone Tiles in random sizes to the concourse area including latex screed to all subfloor areas.

DISNEY – The installation of 600mm x 300mm Composite Stone Tiles to curved feature walkway with Manningtons American ‘Click Plank’ to the remainder of the sales floor including all subfloor preparation.

Association Memberships

Safe Contractor Approved Safecontractor is the leading health and safety pre-qualification
Constructionline Approved Ensuring cross industry standards and open channels of communication.
The Tile Association The Tile Association is dedicated to the advancement of all sectors ...
The Contractors Health and Safety Assessment Scheme We are dedicated to completing health and safety pre-qualification assessments.
Construction Skills Certification Scheme CSCS was set up in the mid-90s with the aim of improving The Contractors Health and Safety Assessment Scheme.