Jaeger, Manchester
JAEGER
Description:
Ceramic Tiling to ground floor sales area.
Carpet Tiles to back of house offices.
Solid timber to basement sales floor and connecting staircase with nosings.
JAEGER
Description:
Ceramic Tiling to ground floor sales area.
Carpet Tiles to back of house offices.
Solid timber to basement sales floor and connecting staircase with nosings.
HUGO BOSS
Duration 3 Weeks
The project involved the laying of Granite Floor tiles throughout sales floor.
Commercial vinyl was used to the back of house areas.
DEBENHAMS
Description:
Debenhams have been running a series of refurbishments to their current stores throughout the UK.
We have been involved in a number of these projects including The Trafford Centre Manchester, Merry Hill Shopping Centre near Dudley, West Orchards Shopping Centre in Coventry and the Fishergate Centre at Preston.
Works have included the strip up of the existing floor coverings with subfloor preparations prior to installation of porcelain tiles to the cosmetic area, Amtico, Axminister carpet and Altro safe flooring to various areas.
FREE SCHOOL
Duration 2 weeks
The project consisted of the supply and installation of Vinyl Safety sheeting, Vinyl Plank, Carpet Tiles and Entrance Matting.
We installed 6mm plywood to the subfloor fully fixed with a feather screed finish throughout prior to laying the floor coverings.
The Vinyl sheeting was a mixture of Polysafe Ultima, Polysafe Hydro and Polyflor Sports 67.
The vinyl plank was part of the Project Floor medium collection and the carpet tiles from National Carpet Tiles Zeon range.
WOOLSTON MILLS
This was a £25m redevelopment scheme converting the former Woolston Warehouse into boutique apartments.
Working closely with the architects, we specified the products for the installation.
Natural Wool Berber carpet on underlay was laid throughout the apartments with Karndean Vinyl Tiles to the kitchen area and Ceramic Tiles to the walls and floors in the bathrooms.
Heavy Contract Carpet Tiles from a Burmatex range were installed in all communal areas with Quantum nosings to stairs. The entrance to Woolston Mill was laid with Ceramic tiles and a glass mosaic feature wall.
MARIE CURIE HOSPICE
Duration: 12 weeks
The refurbishment project at the Marie Curie Hospice, Edinburgh was designed to provide a number of new facilities including more single occupancy rooms, en-suite facilities and a glass-fronted reception area.
Our contract was to carry out sub floor preparation work throughout including the installation of DPM and Latex Screed.
Tarkett Safetread Wood Vinyl Sheeting was installed to approximately 1000m² with Tarkett Eclipse Premium insert border.
Desso Libra Lines carpet tiles and Desso Entry Matting system were installed to the Reception and Visitor Areas totalling 100m².
BLUE BOAR
Duration: 4 Weeks
The contract was to carry out both flooring and tiling works during the refurbishment of the hotel and restaurant.
A mixture of carpet and luxury vinyl tiles were installed to the bedrooms and communal areas with brick slip ceramic tiles used in the en-suite bathrooms.
Solid timber planks were installed throughout the restaurant and function room with a slate tile finish to the bar surround.
Brick slip tiles were installed to the back of bar area, kitchen and toilets.
Safety vinyl was installed to all wet areas.
ZIZZI’S
Duration: 4 Weeks
The contract was to carry out tiling and vinyl sheet works to both the front and back of house areas.
Decorative white 200 x 100 wall tiles were installed in a brick bond pattern to the area behind the restaurant bar and throughout the kitchen areas.
With a hexagonal mosaic floor tile in white and a black ‘rosette’ detail running in front of the bar and kitchen area.
The same hexagonal mosaic floor tile was installed to the toilet area with decorative gloss green 200 x 100 wall tiles to finish.
The back of house tilling were in white 200 x 100 wall tiles which were installed in a brick bond pattern with Altro Stronghold vinyl sheet to floor areas.
Aqua Nomad 8500 matting was installed in the entrance.
ASDA
Duration: On going
We have carried out various installations within ASDA stores across the country. Below are the details of a recent installation carried out at ASDA Crown Point Retail Park – Leeds
Working in two teams on day and night shifts, we stripped up the existing floor coverings to the ground and first floor sales area prior to installing 3mm latex screed.
Forbo External Wood vinyl sheeting with installed throughout both floors totalling approximately 3750m².
As well as above we installed Coral Duo Active matting to the entrance, Forbo External Wood to all back of house areas including sit on skirting throughout.